Search for the word or phrase:
Help
Advanced
Search in:
this manual only.
all manuals.
Manual Notice
| Bridge Project Development Manual |
TxDOT Manual System
♦
Manual Notice 2008-1
►
1.
Organizational Overview
►
1.
This Manual
♦
Overview
♦
Manual Organization
♦
Feedback
►
2.
Coordinating with Other Divisions and Sections
♦
Overview
♦
Bridge Division
♦
Design Division
♦
Transportation Planning and Programming Division (TPP)
♦
Traffic Operations Division (TRF), Railroad Section (RR)
♦
Environmental Affairs Division (ENV)
♦
Construction Division, Materials and Pavements Section
♦
Maintenance Division, Maintenance Operations Section
♦
Turnpike Authority Division
►
2.
Bridge Programming and Funding
►
1.
Bridge Division’s Role
♦
Overview
►
2.
Highway Bridge Program
♦
Overview
♦
Eligibility Requirements
♦
Statewide Prioritization
♦
Administration of Off-System Highway Bridge Program Projects
♦
Program Call and Development Cycle
♦
Requests for Remedial Work on Completed Federal Off-System Highway Bridge Program Projects (UTP Category 6 OFF)
►
3.
Federal Railroad Grade Separation Program
♦
Overview
♦
Work Limitations
♦
Prioritization of New Highway-Rail Grade Separation Projects
♦
Prioritization of Railroad Underpass Replacement/Rehabilitation Projects
►
3.
Preliminary Design Features
►
1.
General Features
♦
Bridge Standard Drawings
♦
Bridge Widths
♦
Bridge and Span Lengths
♦
Vertical Curvature
♦
Horizontal Alignment
♦
Skew
♦
Superelevation, Transitions, and Cross Slopes
♦
Bridge Medians
♦
Sidewalks and Curbs on Bridges
♦
Bike Paths
♦
Illumination
♦
Railings
♦
Beginning and End of Bridges
♦
Design Exceptions, Waivers, and Variances
♦
Design Exceptions
♦
Design Waivers
♦
Design Variances
♦
Corrosion Protection Systems
♦
Loads on Bridge Decks
♦
Excavation Protection Requirements
♦
Bridge Joints
♦
Stage Construction-—Existing Structure Removal
♦
Stage Construction—New Substructure
♦
Stage Construction—New Superstructure
♦
Temporary Railing
►
2.
Features Based on Bridge Location
♦
Highway Grade Separation
♦
Structures over Streams
♦
Railroad Overpasses
♦
Railroad Underpasses
♦
Pedestrian Bridges
♦
Overhead Sign Supports
♦
Federally Funded Off-System Bridges
♦
Historic Bridges
♦
Bridges Not Funded by TxDOT
►
4.
Advanced Planning
►
1.
General Considerations
♦
New Bridges
♦
Modification of Existing Structures
♦
Stage Construction
♦
Detour/Temporary Crossing Structures
♦
Economic Comparisons/Alternate Designs
♦
State versus Federal Oversight
♦
Environmental Concerns
♦
Accessibility/ADA Considerations
►
2.
Considerations Based on Bridge Location
♦
Highway Grade Separations
♦
Structures over Streams
♦
Highway-Rail Grade Separations
♦
Pedestrian Bridges
♦
International Bridges
♦
Historically Significant Bridges
♦
On-System Bridges with Adjacent States
♦
Federally Funded Off-System Bridges
♦
Interchanges
♦
Overhead Sign Supports
♦
Utility Structures
►
3.
Agreements and Permits
♦
U.S. Army Corps of Engineers
♦
U.S. Coast Guard
♦
Environmental Protection Agency
♦
Railroad
♦
International Boundary and Water Commission
♦
Natural Resources Conservation Service
♦
Navigation Districts, Water Districts, Irrigation Districts, Water and River Authorities
♦
Local Government Agencies
♦
Louisiana, Arkansas, Oklahoma, New Mexico
♦
Mexico
►
4.
Utility Attachments
♦
Overview
♦
Guidelines
♦
Coordinating the Agreement
♦
United States Geologic Survey -- Gauging Stations
♦
Texas Water Development Board
♦
Counties and Municipalities
►
5.
Preliminary Layout Approval Process
►
1.
Preliminary Bridge Layouts
♦
Overview
►
2.
Layout Considerations and Requirements
♦
Layout Approval Information
♦
Federal Compliance
►
3.
Bridge Division Submittal Requirements
♦
Submission Requirements
►
4.
Submission Schedule
♦
Submission Schedules
►
6.
Plans, Specifications, and Estimates (PS&E) Review
►
1.
PS&E Review Process
♦
Overview
♦
Project PS&E Schedule
►
2.
PS&E Approval Requirements
♦
Overview
♦
Plans
♦
Specifications
♦
Estimates
Bridge Project Development Manual
April 2008
Printer-friendly version (PDF)