Anchor: #CACIIHHH

Section 2: Requests for Development of Bridge and Geotechnical Work

Anchor: #i1002011

Design Detail Requests

Submit all structures to be let under a single project as one submittal to ensure uniformity of design and eliminate duplication of standards. Submittal requirements for typical bridge layouts, and bridge layouts involving a railroad, are listed below. See Section 1 of this Chapter for the typical bridge project submission schedule.

The transmittal e-mail from the District to the Bridge Division project manager must contain the following information:

Previous page  Next page   Title page