Search for the word or phrase:
Help
Advanced
Search in:
this manual only.
all manuals.
Manual Notice
| Hazardous Materials in Project Development Manual |
TxDOT Manual System
♦
Manual Notice 2007-1
►
1.
Introduction
►
1.
Overview
♦
Scope of Guidance
♦
Responsibilities
♦
Obtaining Assistance
►
2.
Hazardous Material Concerns
♦
Hazardous Materials/Waste
♦
Why Address Hazardous Materials in Project Development?
♦
Concerns for TxDOT Pertinent to Hazardous Materials Issues
►
3.
TxDOT Decisions and Communication
♦
Decision-Making Process
♦
Communication
►
2.
Advanced Planning and Environmental Documentation
►
1.
Overview
♦
Goals
♦
Procedure Overview
►
2.
Site Assessments and Investigations
♦
Definition and Purpose
♦
Outside Guidance and Standard Practices
♦
Types of Site Assessments
♦
Phase I or Initial Site Assessment (ISA)
♦
Phase II Environmental Site Assessments or Investigations (ESA)
►
3.
Planning and Preliminary Engineering Considerations
♦
Planning and Programming
♦
Disclosure and Right of Entry
♦
Early Coordination with Property Owners/Regulatory Agencies
♦
Preliminary Design and Feasibility Studies
♦
Alternative Analysis and Selection
♦
Project Development Considerations
♦
Project Files
►
4.
Environmental Documentation and Clearance
♦
Overview
♦
General Requirements for Hazardous Material Discussions
♦
Draft Environmental Impact Statement (DEIS)
♦
Final Environmental Impact Statement (FEIS)
♦
Supplemental EIS and Re-Evaluation Documents
♦
Environmental Review and Clearance
►
3.
Right of Way
►
1.
Overview
♦
Goals
♦
Procedure Overview
♦
Complete Assessments/Investigations
♦
Advanced Acquisition of Right-of-way
♦
Postponing Acquisition
♦
Appraisals
♦
Agreements
♦
Deed Recordation and Title Searches
♦
Temporary Leases (Lease Backs)
♦
Local Public Agency Acquisition
♦
Cost Recovery
►
2.
Asbestos-Containing Materials
♦
TxDOT's Perspective (Overview)
♦
Asbestos Regulation Summary
♦
Definitions
♦
Asbestos Management in Facilities and Public Buildings
♦
Owner Retention, Acquisition and Sale of Improvements
♦
Options for Obtaining Asbestos Services
►
3.
Petroleum Storage Tanks (PSTs) and Leaking Petroleum Storage Tank (LPST) Facilities
♦
TxDOT's Perspective (Overview)
♦
Regulation and Liability Summary
♦
PST System or LPST Facility Acquisition
♦
PST Removal Steps
♦
LPST Facility Steps
♦
UST System Encroachments
♦
Underground Storage Tank Removal or Corrective Action Performed by TxDOT
►
4.
Other Permitted or Regulated Sites
♦
Overview
►
4.
Design
►
1.
Overview
♦
Goals
♦
Procedure Overview
♦
2.
Environmental Site Assessment and Investigations
►
3.
Design Considerations and Factors
♦
Avoidance and Minimization
♦
Design Considerations
►
4.
Contamination Factors and Considerations during Construction
♦
Contamination Factors during Construction
♦
Contamination Considerations during the Construction Design Phase
►
5.
Plans, Specifications & Estimates (PS&E) Requirements
♦
Plans
♦
Specifications
♦
Estimates
♦
6.
Cost Recovery and Accounting
►
5.
Construction
►
1.
Overview
♦
Goals
♦
Procedure Overview
►
2.
TxDOT Standard Specifications
♦
Item 1.58. Definition of Hazardous Materials or Waste
♦
Item 7.1. Laws to be Observed
♦
Item 6.10. Hazardous Materials
►
3.
Anticipated Hazardous Materials Encountered during Construction
♦
Coordination
♦
Implement Provisions and Oversight
♦
Documentation
►
4.
Unanticipated Hazardous Materials Encountered during Construction
♦
Discovery
♦
Notification and Coordination
♦
Characterize the Contaminant and Develop Preventive Action Plan
♦
Documentation
►
5.
Cost Recovery and Accounting
♦
Federal Participation
♦
Cost Accounting
♦
Responsible Parties
►
6.
Hazardous Materials Services Contracts
►
1.
Overview
♦
Procedure Overview
♦
Statute and Regulation Overview
♦
Specific Hazardous Material Services
♦
Developing Specifications or Requests for Estimates
♦
Communication
►
2.
Architectural and Engineering Contracts
♦
Category 2.13.1 Hazardous Materials Initial Site Assessment
♦
Limitations of Category
♦
Services Provided by the Engineer
►
3.
Statewide Environmental Engineering Services Contracts
♦
Introduction to Contracts
♦
Division/District Responsibilities
♦
Statewide Consultant Responsibilities
♦
Assigning a Statewide Consultant
♦
Proposal Requirements
♦
Proposal Review Process
♦
Work Authorization
♦
Supplemental Work Authorization Requirements
♦
Emergency Work Authorization
♦
Work Authorization Project Management
♦
Work Authorization Closeout
♦
Statewide Consultant Evaluation
►
4.
Purchase of Service
♦
Hazardous Material Services
►
7.
Training and Certifications
►
1.
Hazardous Materials Tasks and Minimum Qualifications
♦
Hazardous Materials Qualifications
►
2.
Hazardous Materials Training
♦
Hazardous Materials Recommended Training
♦
Out-of-Agency Training Providers
Hazardous Materials in Project Development Manual
September 2007
Printer-friendly version (PDF)