Introduction

Mix placement and compaction are the two most important elements in HMA pavement construction. Mix placement involves any equipment or procedures used to place the delivered HMA on the desired surface at the desired thickness. Mix placement can involve complicated asphalt paver operations or simple manual shoveling. This section provides a basic description of HMA placement operations. The Hot Mix Asphalt Paving Handbook (TRB, 2000) and the Asphalt Institute's HMA Construction Manual (2001) contain detailed information on asphalt paver components.

Anchor: #i1009414

Placement Considerations

There are, of course, many considerations to take into account when placing HMA. Many are dependent upon local materials, weather, crew knowledge and training, and individual experience. This subsection presents a few of the basic considerations that apply in virtually all situations:

  • Lift thickness. A "lift" refers to a layer of pavement as placed by the asphalt paver. In order to avoid mat tearing (which generally shows up as a series of longitudinal streaks) a good rule-of-thumb is that the depth of the compacted lift should be at least three times the nominal maximum aggregate size (TRB, 2000) Table 6-3 provides the minimum and maximum lift thickness for every mix type.
Anchor: #i1029485Table 6-3: TxDOT Min. Lift Thickness Requirement

Mix Type

Min. Lift Thickness (in.)

Max. Lift Thickness (in.)

Type A

3.00

6.0

Type B

2.50

5.0

Type C

2.00

4.0

Type D

1.50

3.0

Type F

1.25

2.5

SP-A

3.00

5.0

SP-B

2.25

4.0

SP-C

1.50

3.0

SP-D

1.25

2.0

CMHB-C

2.00

4.0

CMHB-F

1.50

3.0

SMA-C

2.25

4.0

SMA-D

1.50

3.0

SMA-F

1.25

2.5

SMAR-C

2.00

4.0

SMAR-F

1.50

3.0



  • Longitudinal joints. The interface between two adjacent and parallel HMA mats. Improperly constructed longitudinal joints can cause premature deterioration of multilane HMA pavements in the form of cracking and raveling.
  • Handwork. HMA can be placed by hand in situations where the paver cannot place it adequately. This can often occur around utilities, around intersection corners and in other tight spaces. Hand-placing should be minimized because it is prone to aggregate segregation and results in a slightly rough surface texture. If hand placement is necessary, the following precautions should be taken (Asphalt Institute, 2001):
    • Place the HMA in a pile far enough away from the placement area that the whole pile must be moved. If the pile is located in the placement area, its appearance, density or aggregate distribution may be slightly different than the surrounding hand worked mat.
    • Carefully deposit the material with shovels and then spread with lutes. Do not broadcast (scoop and pitch) the HMA with shovels - this is likely to cause aggregate segregation.
    • All material should be thoroughly loosened and evenly distributed. Chunks of HMA that do not easily break apart should be removed and discarded.
    • Check the hand worked surface with a straightedge or template before rolling to ensure uniformity.
  • Performance Design Mixtures & Stone Matrix Asphalt (SMA). Open graded mixes behave differently than dense-graded mixes during placement and compaction. Experience and understanding of dense-graded mix placement should be augmented with specific training and precautions before attempting to place an SMA or a performance design mix for the first time. SMAs are generally stickier and more difficult to work with than dense-graded mixes because (1) they have more asphalt binder, (2) the asphalt binder is modified, and (3) the binder and filler combination creates viscous mastic. Also, it is not uncommon for large amounts of mastic (the combination of asphalt binder and mineral filler) to collect on paving equipment. If not carefully monitored, this mastic will release from the equipment into the mat leaving an over-asphalted area - commonly referred to as a "fat spot." These considerations only scratch the surface of SMA construction. A more thorough treatment can be found in:

    National Asphalt Pavement Association (NAPA). 1999. Designing and Constructing SMA Mixtures - State-of-the-Practice, Quality Improvement Series 122. National Asphalt Pavement Association. Lanham, MD.

  • Mat problems. The asphalt paver, MTV, rollers, mix design and manufacturing introduce many variables into flexible pavement construction. A familiarity with common causes of the more typical mat problems can help improve construction quality. Some common mat problems are micro cracking, fat spots, joint problems, non-uniform texture, roller marks, shoving, surface waves, tearing (streaks) and transverse screed marks.
Anchor: #i1009480

Asphalt Paver

In 1934, Barber-Greene introduced the Model 79 asphalt laydown machine, a self-propelled formless laydown machine with a floating screed (Tunnicliff, Beaty and Holt, 1974). Since then, the basic concept of the asphalt paver has remained relatively unchanged:

  1. HMA is loaded in the front,
  2. carried to the rear by a set of flight feeders (conveyor belts),
  3. spread out by a set of augers,
  4. then leveled and compacted by a screed.

This set of functions can be divided into two main systems:

  • the tractor (or material feed system)
  • the screed.

Tractor (Material Feed System)

The tractor contains the material feed system, which accepts the HMA at the front of the paver, moves it to the rear and spreads it out to the desired width in preparation for screed leveling and compaction. The basic tractor components are:

  • Push Roller and Truck Hitch. The push roller is the portion of the paver that contacts the transport vehicle and the truck hitch holds the transport vehicle in contact with the paver (see Figure 6-20 and Figure 6-21). They are located on the front of the hopper.

Push Roller and Truck Hitch.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1001749grtop

Figure 6-20. Push Roller and Truck Hitch. © Copyright 2006 University of Washington

Truck hitch engaged.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1001753grtop

Figure 6-21. Truck hitch engaged. © Copyright 2006 University of Washington

  • Hopper. The hopper is used as a temporary storage area for HMA delivered by the transport vehicle. Therefore, the paver can accept more material than is immediately needed and can use the volume in the hopper to compensate for fluctuating material demands created by such things as paving over irregular grades, utility access openings or irregular intersection shapes. Hopper sides (or “wings”) can be tilted up (or “folded”) to force material to the middle where it is carried to the rear by the conveyor system (see Figure 6-22). Hoppers can also be fit with inserts to allow them to carry more HMA (see Figure 6-23). These inserts are typically used in conjunction with a material transfer vehicle (MTV).

Hopper with wings folded up.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1001757grtop

Figure 6-22. Hopper with wings folded up. © Copyright 2006 University of Washington

Caterpillar AP-1055B with hopper insert.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1001761grtop

Figure 6-23. Caterpillar AP-1055B with hopper insert. © Copyright 2006 University of Washington

  • Conveyor. The conveyor mechanism carries the HMA from the hopper, under the chassis and engine, and then to the augers (see Figure 6-24 and Figure 6-25). The amount of HMA carried back by the conveyors is regulated by either variable speed conveyors and augers or flow gates, which can be raised or lowered by the operator or, more often, by an automatic feed control system.

Conveyors.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1001765grtop

Figure 6-24. Conveyors. © Copyright 2006 University of Washington

Conveyors (seen from the rear of a partially
built paver).
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1001769grtop

Figure 6-25. Conveyors (seen from the rear of a partially built paver). © Copyright 2006 University of Washington

  • Auger. The auger receives HMA from the conveyor and spreads it out evenly over the width to be paved (see Figure 6-26). There is one auger for each side of the paver and they can be operated independently. Some pavers allow the augers to be operated in reverse direction so that one can be operated forward and the other in reverse to send all the received HMA to one side of the paver. The auger gearbox can either be located in the middle (between the augers as shown in Figure 6-27) or on the outside edge of each auger. If an inadequate amount of HMA is distributed under a middle-located gearbox the result can be a thin longitudinal strip of mat aligned with the gearbox that exhibits lower densities from aggregate segregation and/or temperature differentials (see Figure 6-28 and Figure 6-29).

Augers distributing HMA.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1001773grtop

Figure 6-26. Augers distributing HMA. © Copyright 2006 University of Washington

Paver Augers (note, gear box in between
augers).
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1001777grtop

Figure 6-27. Paver Augers (note, gear box in between augers). © Copyright 2006 University of Washington

Gearbox Streak.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1001781grtop

Figure 6-28. Gearbox Streak. © Copyright 2006 University of Washington

Gearbox streak in a new mat.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1001785grtop

Figure 6-29. Gearbox streak in a new mat. © Copyright 2006 University of Washington

Operation of the tractor, and specifically the material feed system, can have significant effects on overall construction quality and thus long-term pavement performance. Although there are many detailed operational concerns, the two broad statements below encompass most of the detailed concerns:

  1. HMA must be delivered to maintain a relatively constant head of material in front of the screed. This involves maintaining a minimum amount of HMA in the hopper, regulating HMA feed rate by controlling conveyor/auger speed and flow gate openings (if present), and maintaining a constant paving speed. As the next section will discuss, a fluctuating HMA head in front of the screed will affect the screed angle of attack and produce bumps and waves in the finished mat.
  2. The hopper should never be allowed to empty during paving. This results in the leftover cold, large aggregate in the hopper sliding onto the conveyor in a concentrated mass and then being placed on the mat without mixing with any hot or fine aggregate. This can produce aggregate segregation or temperature differentials, which will cause isolated low mat densities. If there are no transport vehicles immediately available to refill the hopper it is better to stop the paving machine than to continue operating and empty the hopper (TRB, 2000).

Screed

The most critical feature of the paver is the self-leveling screed unit, which determines the profile of the HMA being placed (Roberts et al., 1996). The screed takes the head of HMA from the material delivery system, strikes it off at the correct thickness and provides initial mat compaction. This section describes screed terminology, basic forces acting on the screed, screed factors affecting mat thickness and smoothness, automatic screed control, screed operation summary.

1. Screed Terminology. The following is a list of basic screed components and terms:

  • Screed plate. The flat bottom portion of the screed assembly that flattens and compresses the HMA.
  • Screed angle (angle of attack). The angle the screed makes with the ground surface.
  • Strike-off plate. The vertical plate just above the leading edge of the screed used to strike off excess HMA and protect the screed’s leading edge from excessive wear.
  • Screed arms. Long beams that attach the screed to the tractor unit (see Figure 6-30).
  • Tow point. Point at which the screed arm is attached to the tractor unit (see Figure 6-31).
  • Depth crank. The manual control device used to set screed angle and ultimately, mat thickness (see Figure 6-30).
  • Screed heater. Heaters used to preheat the screed to HMA temperature. HMA may stick to a cold screed and cause mat tearing. After the screed has been in contact with the HMA for a short while (usually about 10 min.) its temperature can be maintained by the HMA passing beneath it and the heater can be turned off. If the screed is removed from contact with HMA for an extended period of time, it may need to be preheated again before resuming paving.
  • Screed vibrator. Device located within the screed used to increase the screed’s compactive effort. Screed compaction depends upon screed weight, vibration frequency and vibration amplitude.
  • Screed extensions. Fixed or adjustable additions to the screed to make it longer (see Figure 6-32 and Figure 6-33). Basic screed widths are between 2.4 m (8 ft.) and 3.0 m (10 ft.). However, often it is economical to use wider screeds or adjustable width screeds. Therefore, several manufacturers offer rigid extensions that can be attached to a basic screed or hydraulically extendable screeds that can be adjusted on the fly.

Screed close-up showing the screed arm
and depth crank.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1001789grtop

Figure 6-30. Screed close-up showing the screed arm and depth crank. © Copyright 2006 University of Washington

Tow Point.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1001793grtop

Figure 6-31. Tow Point. © Copyright 2006 University of Washington

Hydraulic Screed Extension.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1001797grtop

Figure 6-32. Hydraulic Screed Extension. © Copyright 2006 University of Washington

(This screed is extended too far [resulting in poor mix delivery and placement] and the tack coat is subpar.)

Screed Extension.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1001801grtop

Figure 6-33. Screed Extension. © Copyright 2006 University of Washington

2. Screed Forces. There are six basic forces (see Figure 6-34) acting on the screed that determine its position and angle (Roberts et al., 1996):

  • Towing force. This is provided by the tractor and exerted at the tow point. Thus, towing force is controlled by paver speed.
  • Force from the HMA head resisting the towing force. This is provided by the HMA in front of the screed and is controlled by the material feed rate and HMA characteristics.
  • Weight of the screed acting vertically downward. This is obviously controlled by screed weight.
  • Resistive upward vertical force from the material being compacted under the screed. This is also a function of HMA characteristics and screed weight.
  • Additional downward force applied by the screed’s tamping bars or vibrators. This is controlled by vibratory amplitude and frequency or tamping bar force.
  • Frictional force between the screed and the HMA under the screed. This is controlled by HMA and screed characteristics.

Screed components and forces.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1001805grtop

Figure 6-34. Screed components and forces. © Copyright 2006 University of Washington

3. Factors Affecting Mat Thickness and Smoothness

  • Since the screed is free floating it will slide across the HMA at an angle and height that will place these six forces in equilibrium. When any one of these forces is changed, the screed angle and elevation will change (which will change the mat thickness) to bring these forces back into equilibrium. Therefore, changing anything on the paver that affects these forces (such as paver speed, material feed rate or screed tow point) will affect mat thickness. Furthermore, since mat thickness needs to be closely controlled, pavers have controls to manually set screed angle rather than rely on a natural equilibrium to determine mat thickness.
  • In typical paving operations the screed angle is adjusted to control mat thickness. In order to understand how a manually controlled screed angle affects mat thickness, a brief discussion of how the paver parameters of speed, material feed rate and tow point elevation affect screed angle, screed height and, therefore, mat thickness is provided.
    • Speed. Paver speed affects mat thickness by changing the screed angle. If a paver speeds up and all other forces on the screed remain constant, the screed angle decreases to restore equilibrium, which decreases mat thickness. Similarly, as paver speed decreases, screed angle increases, this increases mat thickness.
    • Material Feed Rate. The amount of HMA in front of the screed (the material “head”) can also affect screed angle and thus mat thickness. If the material head increases (either due to an increase in material feed rate or a reduction in paver speed), screed angle will increase to restore equilibrium, which increases mat thickness. Similarly, if the material head decreases (either due to a decrease in material feed rate or an increase in paver speed), screed angle will decrease to restore equilibrium, which decreases mat thickness (TRB, 2000). Therefore, in order to maintain a constant mat thickness for a change in paver speed or material head in front of the screed, the natural equilibrium of forces on the screed cannot be relied upon and the screed angle must be manually adjusted using a thickness control screw or depth crank. Screed angle adjustments do not immediately change mat thickness but rather require a finite amount of time and tow distance to take effect. Figure 6-35 shows that it typically takes five tow lengths (the length between the tow point and the screed) after a desired level is input, for a screed to arrive at the new level. Because of this screed reaction time, a screed operator who constantly adjusts screed level to produce a desired mat thickness will actually produce an excessively wavy, unsmooth pavement.

      Screed reaction to a manual decrease in
screed angle, (after TRB, 2000).
© 2006 University of Washington (click in image to see full-size image) Anchor: #i1001809grtop

      Figure 6-35. Screed reaction to a manual decrease in screed angle, (after TRB, 2000). © 2006 University of Washington

      Tow Point Elevation. Finally, tow point elevation will affect screed angle and thus mat thickness. As a rule-of-thumb, a 25 mm (1 in.) movement in tow point elevation translates to about a 3 mm (0.125 in.) movement in the screed's leading edge. Without automatic screed control, tow point elevation will change as tractor elevation changes. Tractor elevation typically changes due to roughness in the surface over which it drives. As the tow point rises in elevation, the screed angle increases, resulting in a thicker mat. Similarly, as the tow point lowers in elevation, the screed angle decreases, resulting in a thinner mat. Locating the screed tow point near the middle of the tractor significantly reduces the transmission of small elevation changes in the front and rear of the tractor to the screed. Moreover, because the screed elevation responds slowly to changes in screed angle, the paver naturally places a thinner mat over high points in the existing surface and a thicker mat over low points in the existing surface (TRB, 2000). The interaction of paver speed, material feed rate and tow point elevation determine the screed position without the need for direct manual input. This is why screeds are sometimes referred to as "floating" screeds.

4. Automatic Screed Control. As discussed previously, the screed angle can be manipulated manually to control mat thickness. However, tow point elevation is not practical to manually control. Therefore, pavers usually operate using an automatic screed control, which controls tow point elevation using a reference other than the tractor body. Since these references assist in controlling HMA pavement grade, they are called “grade reference systems” and are listed below (Roberts et al., 1996):

  • Erected stringline. This consists of stringline erected to specified elevations that are independent of existing ground elevation. Most often this is done using a survey crew and a detailed elevation/grade plan. Although the stringline method provides the correct elevation (to within surveying and erecting tolerances), stringlines are fragile and easily broken, knocked over or inadvertently misaligned. Lasers can be used to overcome the difficulties associated with stringlines because they do not require any fragile material near the pavement construction area. Lasers can establish multiple elevation or grade planes even in dusty or high-electronic and light-noise areas and are therefore sometimes used to construct near-constant elevation airport runways. The laser method becomes quite complicated, however, when frequent pavement grade changes are required.
  • Mobile reference. This consists of a reference system that travels with the paver such as a long beam or tube attached to the paver (called a "contact" device since it actually touches the road - see Figure 6-36) or an ultrasonic device (called a "non-contact" device since it relies on ultrasonic pulses and not physical contact to determine road elevation). The mobile reference system averages the effect of deviations in the existing pavement surface over a distance greater that the wheelbase of the tractor unit. Minimum ski length for a contact device is normally about 7.5 m (25 ft.) with a typical ski lengths being on the order of 12 to 18 m (40 to 60 ft.) (Asphalt Institute, 2001).
  • Joint matching shoe. This usually consists of a small shoe or ski attached to the paver that slides on an existing surface (such as a curb) near the paver. Ultra sonic sensors accomplish the same task without touching the existing surface by using sound pulses to determine elevation. This type of grade control results in the paver duplicating the reference surface on which the shoe or ski is placed or ultra sonic sensor is aimed.

Automatic grade control using a mobile
reference beam.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1001813grtop

Figure 6-36. Automatic grade control using a mobile reference beam. © Copyright 2006 University of Washington

In addition to grade control, the screed can also be set to control pavement slope and/or crown. A slope controller uses a slope sensor mounted on a transverse beam attached to the screed to determine screed slope, then adjusts screed slope to the desired amount. Generally, one side of the screed is set up to control grade and the opposite side is set up to control slope based on that grade. The usual practice is to run grade control on the side of the screed nearest the pavement centerline and run slope control on the screed side nearest the pavement edge because it is easier to match the centerline joint if grade control is used on that side of the paver (TRB, 2000.)

Screed crown (the elevation of the middle in relation to the edges) can also be controlled. Typically, screeds offer separate front and rear crown controls. If crown control is used, the front control is usually set to a slightly more severe crown than the rear control to allow for easier passage of HMA under the screed.

5. Screed Operation Summary

  • The floating screeds used by today’s pavers are acted upon by six basic forces, which when left undisturbed result in an equilibrium screed angle and elevation that determines mat thickness. Adjusting paver speed, material feed rate or tow point elevation will change these forces and result in a new equilibrium screed angle and elevation and eventually a new mat thickness. In order to achieve the most consistent thickness and smoothest possible surface, pavers attempt to maintain a constant speed, use automatic feed controls to maintain a consistent head of material in front of the paver, and use automatic screed control to maintain a consistent tow point. Although the screed angle can be adjusted manually to change mat thickness, excessive adjustments will result in a wavy, unsmooth mat. In addition to grade, screeds can also control mat slope and crown to provide almost complete control over mat elevation at any location.
Anchor: #i1009927

Material Transfer Vehicles (MTVs)

MTVs are used to assist the paver in placing HMA. Most pavers are equipped to receive HMA directly from end dump or live bottom trucks; however in certain situations it can be necessary or advantageous to use an MTV. Paving using bottom dump trucks and windrows requires a windrow elevator MTV (see Figure 6-37 and Figure 6-38), while other MTVs are used to provide additional surge volume, which is advantageous because it allows the paver to operate continuously without stopping, minimizes truck waiting time at the paving site and may minimize aggregate segregation and temperature differentials. This subsection covers:

  • Windrow elevators
  • Surge volume and remixing MTVs.

Windrow Elevators

Windrow elevators are positioned directly in front of pavers and are designed to pick up HMA placed in a windrow and transfer it to the paver hopper. This allows for (1) windrows to be used and (2) virtually continuous paving without stopping. When using windrows and windrow elevators, the windrow laydown rate must match the paver laydown rate. If the amount of material in the windrow is too little or too much, the paver may become overloaded or may run dry and have to stop. To avoid this, windrow paving operations typically have some method (e.g., a loader) available to add or subtract material from the windrow. Some windrow paving operations establish a windrow laydown rate slightly less than the paver laydown rate then periodically add material to the windrow with an end dump truck. Other windrow paving operations leave periodic spaces in the windrow to avoid paver overloading.

Windrow paving.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1002534grtop

Figure 6-37. Windrow paving. © Copyright 2006 University of Washington

Windrow Elevator.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1002538grtop

Figure 6-38. Windrow Elevator. © Copyright 2006 University of Washington

Other MTVs are used to provide an additional surge volume for the paver (see Figure 6-39; Figure 6-40; Figure 6-41; Figure 6-42). This surge volume allows for continuous paver operations. With an MTV, the paver no longer has to stop while one truck leaves and the next truck backs up. Additionally, the MTV serves as a buffer between the paver and the haul trucks, which eliminates most truck bumping problems. Finally, most MTVs offer some sort of remixing capability that remixes the cool HMA crust formed during transport with the hot interior HMA to produce a more uniform mix entering the paver. This remixing can essentially eliminate aggregate segregation and temperature differentials. Some states have actually implemented specifications that require a remixing MTV for paving contracts where segregation and temperature differentials are of concern.

Surge Volume and Remixing MTVs

Surge volume / remixing MTVs are typically used in tandem with a paver hopper insert that increases the capacity of the paver hopper (see Figure 6-23). The insert is removable and sometimes contains remixing apparatus (such as a pugmill) near the bottom. At least one manufacturer has developed a paver solely for use with an MTV. The Roadtec StealthTM paver uses gravity feed and does not contain conveyors, hopper wings or push rollers, which reduces initial cost as well as maintenance costs (Roadtec, 2001).

Blaw Knox MC-30 MTV.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1002542grtop

Figure 6-39. Blaw Knox MC-30 MTV. © Copyright 2006 University of Washington

Cedarapids MS-3 MTV.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1002546grtop

Figure 6-40. Cedarapids MS-3 MTV. © Copyright 2006 University of Washington

Roadtec Shuttle Buggy MTV. (click in image to see full-size image) Anchor: #i1002550grtop

Figure 6-41. Roadtec Shuttle Buggy MTV.

© Copyright 2006 University of Washington

Roadtec shuttle buggy, front view, showing
loading hopper for end dump and live bottom trucks.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1002554grtop

Figure 6-42. Roadtec shuttle buggy, front view, showing loading hopper for end dump and live bottom trucks. © Copyright 2006 University of Washington

Roadtec Shuttle Buggy Patented Remixing
Auger.
© Copyright 2006 University of Washington (click in image to see full-size image) Anchor: #i1002558grtop

Figure 6-43. Roadtec Shuttle Buggy Patented Remixing Auger. © Copyright 2006 University of Washington

Remixing thoroughness varies from one type of MTV to the next. One idea that seems to work well is the Roadtec Shuttle Buggy patented remixing auger (see Figure 6-43). The auger employs three different pitches that get progressively bigger towards the center of the MTV. This allows for additional material to enter the auger area each time the pitch is increased resulting in thorough remixing.

In summary, MTVs assist with the transfer of HMA from the transport trucks to the paver. There are two basic types of MTVs:

  • windrow elevator MTVs, and
  • surge volume/remix MTVs.

Windrow elevator MTVs are used to pick up HMA from a windrow and place it into the paver hopper while surge volume/remix MTVs provide an additional material surge volume that allows for continuous paving and/or a remix capability that can reduce aggregate/temperature segregation. MTV use costs money and will increase the per ton cost of HMA paving but can help provide superior mat quality. However, MTVs should not be used as a substitute for good production and laydown practices, which are fundamental to good mat quality.