| Project Development Process Manual |
TxDOT Manual System
♦
Manual Notice 2008-1
►
Preface
►
1.
Planning and Programming
►
1.
Needs Identification
♦
Overview
♦
1000: Identify project need and scope
♦
1010: Perform site visit
►
2.
Project Authorization
♦
Overview
♦
1200: Prepare cost estimate
♦
1230: Obtain approval of PLAN authority
♦
1235: Obtain project specific minute order, if required
►
3.
Compliance with Planning Requirements
♦
Overview
♦
1300: Evaluate compliance with planning documents
♦
1310: Identify and review related studies
♦
1320: Obtain input from local entities and others
♦
1340: Coordinate with Metropolitan Planning Organization
►
4.
Study Requirements Determination
♦
Overview
♦
1400: Review scope, cost, and staff requirements of project development
♦
1410: Determine need for feasibility (route/corridor) study
♦
1420: Determine if Statewide Implementation Plan requirements apply
♦
1430: Obtain traffic data
♦
1440: Determine need for Major Investment Study
♦
1450: Identify multimodal alternatives and intermodal connections
♦
1460: Determine conformity with Congestion Management Process requirements
♦
1480: Evaluate inclusion of High Occupancy Vehicle/High Occupancy Toll lanes
♦
1490: Evaluate inclusion of tollways
♦
1500: Evaluate railroad corridor preservation
►
5.
Construction Funding Identification
♦
Overview
♦
1600: Identify potential design/construction funding
♦
1610: Prepare and execute advance funding agreements
♦
1620: Obtain DEVELOP authority
♦
1630: Obtain CONSTRUCT authority
♦
1640: Place project in Transportation Improvement Program (TIP)
♦
1650: Develop Statewide Transportation Improvement Program (STIP)
♦
1670: Place project in one-year letting schedule
►
2.
Preliminary Design
►
1.
Design Concept Conference
♦
Overview
♦
2000: Conduct Design Concept Conference
►
2.
Data Collection/Preliminary Design Preparation
♦
Overview
♦
2110: Conduct early coordination with stakeholders
♦
2120: Prepare and execute additional agreements
♦
2140: Review traffic data
♦
2150: Obtain right of entry
♦
2160: Obtain related data, plans, studies and reports
♦
2180: Obtain information on existing utilities
♦
2190: Obtain traffic crash data
♦
2200: Obtain hydraulic studies
♦
2220: Obtain aerial photography/ planimetrics/ DTMs/ digital orthophotography
♦
2230: Perform topographic surveys
♦
2240: Perform other surveys
►
3.
Public Meeting(s)
♦
Overview
♦
2260: Conduct public meeting
♦
2270: Revise design based on public input
►
4.
Preliminary Schematic
♦
Overview
♦
Alternative Selection
♦
Geometrics
♦
Update cost estimates
♦
2300: Evaluate corridor alternatives
♦
2310: Perform preliminary Level of Service analysis
♦
2320: Evaluate route alternatives
♦
2330: Initiate railroad coordination
♦
2340: Identify requirements for crossing navigable waters
♦
2350: Evaluate geometric alternatives
♦
2360: Develop typical sections
♦
2370: Prepare Assessment of Landscape and Aesthetic Issues
♦
2380: Develop bicyclist/pedestrian accommodation concept
♦
2460: Update cost estimates
►
5.
Geometric Schematic
♦
Overview
♦
2500: Develop preferred geometric alignment
♦
2505: Perform preliminary geotechnical surveys
♦
2510: Prepare pavement design report
♦
2520: Refine typical sections
♦
2530: Consider impacts on historic structures
♦
2540: Perform detailed Level of Service analysis
♦
2550: Determine guide signing and operational controls
♦
2560: Submit requests for new or revised access points to interstate highways
♦
2570: Perform preliminary planning for weigh stations
♦
2580: Perform preliminary planning for bridges
♦
2590: Establish preliminary retaining and/or noise wall locations
♦
2610: Perform hydrologic study
♦
2620: Perform preliminary hydraulic analysis/design
♦
2630: Determine right of way and access needs
♦
2640: Identify existing utilities on geometric schematic
♦
2650: Identify potential utility conflicts
♦
2660: Establish preliminary illumination locations
♦
2670: Conduct constructability review
♦
2690: Update project scope
►
6.
Value Engineering
♦
Overview
♦
2700: Conduct Value Engineering (VE) study
♦
2710: Revise design based on Value Engineering Study findings
►
7.
Geometric Schematic Approval
♦
Overview
♦
2850: Circulate geometric schematic for district review
♦
2860: Review geometric schematic with stakeholders
♦
2870: Submit design exceptions/waivers for approval
♦
2880: Obtain approval of geometric schematic before public hearing
♦
2890: Revise geometric schematic based on input from public hearing
♦
2920: Obtain approval of final geometric schematic
►
3.
Environmental
►
1.
Preliminary Environmental Issues
♦
Overview
♦
3010: Determine public involvement needs
♦
3015: Develop and implement scoping process
♦
3020: Conduct meeting with affected property owners
♦
3030: Collect environmental data
♦
3050: Identify potential Section 4(f) & Texas Parks and Wildlife (TPWD) Chapter 26 properties
♦
3080: Evaluate impacts on waterways and floodplains
►
2.
Interagency Coordination/Permits
♦
Overview
♦
3100: Perform early coordination with review/resource agencies
♦
3110: Determine environmental permit requirements
►
3.
Environmental Documentation
♦
Overview
♦
3210: Determine type of environmental document to prepare
♦
3240: Prepare “Purpose and Need” statement
♦
3250: Conduct natural resources study
♦
3260: Conduct cultural resources study
♦
3270: Prepare Section 4(f) evaluation
♦
3280: Perform hazardous materials assessment and investigation
♦
3300: Prepare socioeconomic/environmental justice analysis
♦
3310: Determine right of way relocation impacts
♦
3315: Analyze existing environment
♦
3330: Conduct noise analysis
♦
3340: Conduct air quality analysis
♦
3345: Determine project’s environmental consequences
♦
3350: Prepare landscape recommendations
♦
3360: Prepare description of project alternatives
♦
3370: Prepare exhibits for environmental documentation
♦
3375: Stake areas of potential impact
♦
3390: Prepare environmental mitigation plans
♦
3420: Process draft environmental document
►
4.
Public Hearing
♦
Overview
♦
3500: Conduct public hearing
♦
3520: Respond to public hearing comments
►
5.
Environmental Clearance
♦
Overview
♦
3600: Obtain environmental clearance
►
4.
Right of Way Utilities
►
1.
Right of Way and Utility Data Collection
♦
Overview
♦
4000: Perform preliminary right of way research
♦
4200: Locate existing utilities
♦
Information on Subsurface Utility Engineering (SUE)
►
2.
Right of Way Map and Property Descriptions
♦
Overview
♦
4300: Prepare right of way map and property descriptions
►
3.
Right of Way Appraisals and Acquisition
♦
Overview
♦
4400: Obtain contractual agreements with local public agencies
♦
4410: Perform advance acquisition for qualified parcels
♦
4415: Obtain authority for right of way project release
♦
4420: Identify impediments to parcel acquisition
♦
4425: Prepare and execute joint-use/multiple-use agreements
♦
4430: Appraise parcels
♦
4470: Implement right of way acquisition process
♦
4480: Implement relocation assistance program
♦
4490: Dispose of improvements
♦
4500: Prepare right of way and encroachment certifications
►
4.
Utility Adjustments
♦
Overview
♦
4610: Coordinate utility adjustment plans
♦
4620: Prepare and execute utility adjustment agreements
♦
4630: Utility owners adjust facilities
♦
4640: Prepare utility clearance certifications
♦
4650: Reimburse utility owners for eligible adjustment costs
►
5.
PS&E Development
►
1.
Design Conference
♦
Overview
♦
5010: Obtain additional or updated data
♦
5020: Conduct Design Conference
►
2.
Begin Detailed Design
♦
Overview
♦
5040: Plan sequence of construction
♦
5050: Develop conceptual detour/road closure plan
♦
5080: Obtain miscellaneous permits
♦
5100: Design environmental mitigation details
♦
5110: Develop Environmental Permits, Issues and Commitments (EPIC) sheet
♦
5120: Review data collection needs
♦
5140: Refine hydrologic study
♦
5150: Prepare stream crossing hydraulics
♦
5160: Prepare hydraulic report
►
3.
Final Alignments/Profiles
♦
Overview
♦
5200: Design final vertical and horizontal alignments
►
4.
Roadway Design
♦
Overview
♦
5240: Prepare cross sections and compute earthwork
♦
5250: Review right of way requirements
♦
5280: Design landscape/aesthetic plans
♦
5290: Develop plan and profile sheets
♦
5300: Design bicyclist and pedestrian facilities
♦
5330: Design miscellaneous details
♦
5335. Review project for design exceptions/waivers
♦
5340: Prepare hazardous material remediation plan
♦
5360: Develop Exhibit A for railroad agreement
►
5.
Operational Design
♦
Overview
♦
5380: Design illumination
♦
5400: Design Intelligent Transportation System (ITS)
♦
5420: Design signalization plan
♦
5440: Design signing and pavement markings
►
6.
Bridge Design
♦
Overview
♦
5460: Perform final geotechnical surveys
♦
5480: Prepare preliminary bridge layouts
♦
5500: Prepare bridge details
♦
5510: District reviews bridge plans
♦
5515: Submit Exhibit B to railroad company
►
7.
Drainage Design
♦
Overview
♦
5540: Perform hydraulic design for culverts and storm drains
♦
5560: Perform hydraulic design for pump station(s)
♦
5570: Prepare culvert and storm drain details
♦
5590: Prepare pump station details
♦
5600: Design Storm Water Pollution Prevention Plan
►
8.
Retaining/Noise Walls & Miscellaneous Structures
♦
Overview
♦
5640: Prepare retaining and/or noise wall layouts
♦
5680: Prepare retaining and/or noise wall plans and details
♦
5700: Prepare plans for miscellaneous structures
►
9.
Traffic Control Plan
♦
Overview
♦
5720: Finalize sequence of construction
♦
5730: Design detour roadways
♦
5740: Obtain approval of road closure/detour plans
♦
5760: Prepare details for temporary signing, striping, and pavement marking
♦
5780: Develop contract requirements
♦
5790: Review traffic control plan
►
10.
PS&E Assembly/Design Review
♦
Overview
♦
5810: Conduct environmental re-evaluation
♦
5830: Prepare PS&E package
♦
5840: Conduct district PS&E review
♦
5850: Assemble project plans
♦
5855: District conducts final agreement/permit review
♦
5860: Collect outside, additional funding based on advance funding agreements
♦
5900: District performs final review of PS&E
♦
5910: Submit PS&E to Design Division
♦
5915: Obtain approval for program overruns
►
6.
Letting
►
1.
Final Processing and Letting
♦
Overview
♦
6000: Perform financial clearance analysis
♦
6010: Prepare and review draft proposal
♦
6030: Obtain funding and approval of PS&E
♦
6100: Release final proposal
♦
6130: Advertise request for bids
♦
6133: Provide earthwork construction cross section data to contractors (if requested)
♦
6135: Amend issued proposal document
♦
6140: Conduct pre-bid conference
♦
6150: Conduct bid opening
♦
6200: Tabulate and review bids
♦
6210: Award contract
♦
6230: Notify the public in advance of construction
♦
6240: Store and retain project records
Project Development Process Manual