Chapter 1: Metropolitan and Urban Policy
Anchor: #BGBCGCCCSection 1: MPO Metropolitan Planning Process
Anchor: #i1003928Summary
The metropolitan planning organization (MPO) shall adhere to a continuous, cooperative, and comprehensive transportation planning process. As a result of this process, the MPO shall develop a long-range Metropolitan Transportation Plan which will contain a list of projects recommended for the forecasted plan year and a Transportation Improvement Program containing a list of projects which have been approved for development in the near term.
Anchor: #i1003938Purpose
To implement 23 U.S.C. 134 and Section 8 of the Federal Transit Act, as amended, and to ensure that transportation needs are adequately addressed for communities located within the MPO boundaries.
Anchor: #i1003948Responsibility
The Transportation Planning and Programming Division is responsible for disseminating information necessary to implement the requirements of 23 U.S.C. 134. The MPO, in cooperation with the department and the publicly owned transit operators, is responsible for carrying out the transportation planning process.
Anchor: #i1003958Reference
Current Policy: 43 TAC 15.5
Reference: 23 CFR Part 450