Section 5: Comparing Test Results
The engineer performs a prompt comparison of the test results obtained by the individual being evaluated and the IA tester. Acceptable tolerance limits for comparing test results from split and proficiency samples are shown in "Acceptable Tolerance Limits for Independence Assurance."
If the comparisons of the test results do not comply with the tolerances, an engineering review of the test procedures and equipment will be performed immediately to determine the source of the discrepancy.
Identify and incorporate corrective actions as appropriate.
Document and report test results from all samples involved in the IA Program in the appropriate district or project files.