Section 5: Preliminary Design Submissions

Anchor: #i1003515

Submissions

The preliminary submission should clearly establish the design criteria or guidelines under which the project is being developed. The following table outlines preliminary design items that should be submitted.

Anchor: #i1002288Preliminary Design Submission

Item

Submission

Design Summary Report

  • Form 1002 with applicable design speed and design criteria
  • Typical section

As soon after project authorization as practical, submit to DES, Field Coordination.

Pavement design

With copy of typical sections to Pavement Design Section, DES, as soon after project authorization as practical.

Schematic layout

Submit to DES, Field Coordination prior to initiating detailed plan preparation.

Exhibit layouts for work on railroad rights of way for railroad agreements

Refer to Traffic Operations Manual, Railroad Operations Volume.

Bridge layouts

Submit in accordance with the Bridge Project Development Manual.

Hike/Bike facility schematic

Submit to DES, Field Coordination prior to initiating detailed plan preparation.