Search for the word or phrase:
Help
Advanced
Search in:
this manual only.
all manuals.
Manual Notice
| Seal Coat and Surface Treatment Manual |
TxDOT Manual System
♦
Manual Notice 2004-1
►
1.
General Principles
►
1.
Overview
♦
General
►
2.
Functions of Surface Treatments and Seal Coats
♦
General
►
3.
Factors Influencing Performance
♦
General
►
4.
Principal Faults or Defects in Seal Coats or Surface Treatments
♦
General
♦
Loss of Aggregate
♦
Poor Adhesion or Bond to Road Surface
♦
Streaking
♦
Flushing
►
2.
Guidelines for Treatment Selection
►
1.
Seal Coats as a Preventive Maintenance Technique
♦
General
►
2.
Selecting Pavements for Seal Coat Treatment
♦
General
♦
Pavement Distress Types
►
3.
Traffic Volume Considerations for Seal Coat Treatment
♦
Overview
♦
Short-Term Aggregate Loss
♦
Vehicular Damage
♦
Tire Noise
♦
Prolonged Traffic Control
►
4.
Strip or Spot Sealing
♦
General
►
5.
Surface Treatments
♦
General
►
6.
Fog Seal
♦
General
►
3.
Material Selection and Plan Preparation
►
1.
Communication and Coordination
♦
General
►
2.
Selection of Binder
♦
General
♦
♦
Asphalt Cement
♦
Cutback Asphalt
♦
Emulsified Asphalt
♦
Specification Tests
♦
Weather Conditions
►
3.
Selection of Aggregate
♦
General
♦
Factors of Aggregate Affecting Performance
♦
Precoated Aggregate
♦
Criteria for Determining Surface Aggregate Classification
♦
Cost Considerations
►
4.
Planning and Contracting
♦
Calculate Quantities
♦
Estimate of Materials
♦
Preparing Plans
♦
Estimating Cost
►
4.
Binder and Aggregate Application Rates
►
1.
Modified Kearby Design Method
♦
General
♦
Laboratory Tests
♦
Determining Design Rates
►
2.
McLeod Design Method
♦
General
♦
Design Procedure Components
♦
McLeod Seal Coat Design Equations
►
5.
Duties of Inspector or Crew Chief
►
1.
Authority of Inspector
♦
General
♦
Inspection of Materials and Work
►
2.
Duties of the Inspector or Crew Chief
♦
General
♦
Duties
►
3.
Specifications and Plans
♦
General
♦
Standard Specifications
♦
Special Specifications
♦
Special Provisions
♦
Plans
►
4.
Safety
♦
General
►
6.
Pre-Seal Coat Activities
►
1.
Overview
♦
General
►
2.
Repairs and Patching
♦
General
♦
Timing
♦
Types of Repairs
►
3.
Stockpiling Aggregate
♦
General
♦
Supplier
♦
Aggregate Sampling and Testing
♦
Stockpile Locations
♦
Contamination
♦
Area Preparation
♦
Proper Stockpile Techniques
►
4.
Preconstruction Meeting
♦
General
♦
Meeting Objectives
♦
Attendees
►
7.
Equipment Inspection
►
1.
Introduction
♦
General
♦
Provisions for Inspection
♦
Inspecting for Leaks
♦
Safety
►
2.
Rotary Broom
♦
General
♦
Identifying Data
♦
Safety Markings
♦
Bristles
♦
Brush Controls
♦
Older Model Brooms
►
3.
Asphalt Distributor
♦
General
♦
Asphalt Binder Tank
♦
Distributor Heating System
♦
Distributor Circulation and Pumping System
♦
Filter Screens
♦
Distributor Spray Bar
♦
Hand Sprayer
♦
Distributor Controls and Gauges
►
4.
Aggregate Spreader
♦
General
♦
Truck Hitch
♦
Receiving Hopper
♦
Belt Conveyors
♦
Discharge Hopper
♦
Discharge Gates
♦
Discharge Roller
♦
Wheels and Tires
♦
Brakes and Clutch
♦
Tailgate Aggregate Spreader
►
5.
Haul Trucks
♦
General
♦
Size
♦
Condition
♦
Hoist
♦
Tailgate
♦
Hitch
♦
Identifying Numbers
♦
Bed Measurements
♦
Volume of Truck Bed with Deduction for Hydraulic Ram Cover
♦
Acceptable Size
►
6.
Rollers
♦
General
♦
Identifying Data
♦
Weight Certification
♦
Pneumatic Rollers
►
7.
Front-End Loader
♦
General
♦
Identifying Data
♦
Visual Inspection
►
8.
Heater and Storage Unit
♦
General
♦
Temperature
♦
Safety
♦
Storage Tank
♦
Heater
♦
Pump Unit
♦
Heater Unit Location
♦
Recording Thermometer
♦
Transporter and Booster
♦
Identifying Data
♦
Manifest
♦
Cleanliness
♦
Contamination
♦
Booster Tanks
♦
Insulation
►
8.
Seal Coat/Surface Treatment Application Process
►
1.
Overview
♦
General
►
2.
Weather
♦
Introduction
♦
Temperature
♦
Humidity
♦
Wind
♦
Rain
►
3.
Traffic Control
♦
Introduction
♦
Pre-Positioning
♦
Displaying Signs
♦
Traffic Cones
♦
Flaggers
♦
Pilot Vehicle
♦
Repositioning Traffic Control Devices
♦
Intersections
♦
Arrow Boards
►
4.
Removing Pavement Markers
♦
General
►
5.
Cleaning the Pavement
♦
Introduction
♦
Safety During Sweeping Operations
♦
Sweeping Pattern
♦
Sweeping Distance from Operation
►
6.
Placing Temporary Tabs
♦
General
►
7.
Setting the Rock Lands
♦
Introduction
♦
Purpose
♦
Calculating the Length of Rock Land
♦
Marking the Rock Lands
►
8.
Setting the Asphalt Shots
♦
Introduction
♦
Asphalt Application Rate
♦
Distributor Capacity
♦
Calculating the Length of Asphalt Shot
♦
Marking the Asphalt Shot
►
9.
Checking the Loader Operation
♦
Introduction
♦
Loader Operation Checklist
►
10.
Placing Paper Joints
♦
Introduction
♦
Equipment
♦
Beginning of Asphalt Shot
♦
End of Asphalt Shot
♦
Subsequent Asphalt Shots with Multiple Distributors
►
11.
Shooting the Asphalt
♦
Introduction
♦
Distributor Preparation
♦
Blow the Nozzles
♦
Check Spray Bar Height
♦
Final Equipment Check
♦
Paper Joint Check
♦
Transverse Alignment
♦
Applying the Asphalt
♦
Timing for Aggregate Application
♦
Additional Distributors
►
12.
Strapping the Distributor
♦
Introduction
♦
Determining Asphalt Application Rate
►
13.
Spreading the Aggregate
♦
Introduction
♦
Aligning the Spreader Box
♦
Truck Hookup
♦
Test Strip
♦
Spreading the Aggregate
♦
Truck/Spreader Separation
♦
Rock Land Marker
♦
Visual Checks
♦
Recording Truck Loads
♦
Asphalt on Tires
►
14.
Timing for Aggregate Application
♦
Introduction
♦
Immediate Aggregate Application
►
15.
Rolling the Aggregate
♦
Introduction
♦
Rolling Pattern
♦
Checking the Rolling Pattern
►
16.
Patching or Hand Work
♦
Introduction
♦
Immediate Repairs
♦
Delayed Repairs
►
17.
Intersections and Irregular Shapes
♦
Introduction
♦
Transitions
♦
Radii at Intersections
♦
Crossovers on Divided Highways
♦
Driveways and Private Roads
♦
Problems with Hand Work
►
18.
Brooming Excess Aggregate
♦
Introduction
♦
Timing
♦
Equipment
♦
Procedures
♦
Inspection
►
19.
Opening to Traffic
♦
Introduction
♦
Traffic Volume
♦
Truck Traffic
♦
Traffic Speed
♦
Asphalt Type and Weather Conditions
♦
Changing Lanes
►
20.
Temporary or Permanent Pavement Markings
♦
General
♦
Temporary Markings
♦
Permanent Markings
►
21.
Placing Raised Pavement Markers
♦
General
►
22.
Cleanup
♦
Joint Paper
♦
Spilled Asphalt
♦
Stockpile Area
♦
Signs and Barricades
♦
Repairs to Damaged Property
►
9.
Public Perception and Complaints
►
1.
Handling Complaints
♦
General
►
2.
Public Perception and Education
♦
General
Seal Coat and Surface Treatment Manual
May 2004
Printer-friendly version (PDF)