Manual Notice
| Railroad Operations Volume |
TxDOT Manual System
♦
Manual Notice 1998-1
►
1.
Introduction
►
1.
General
♦
Introduction
♦
Purpose
♦
Users of this Volume
►
2.
Authority and Policy
♦
Introduction
♦
Governing Statutes (summaries)
♦
Policy Instruments
♦
Texas Attorney General Opinions
♦
Federal Policy
♦
Railroad Practices
►
3.
Operations Involving Railroads
♦
Maintenance Responsibilities
♦
Working on Railroad Right-of-Way
♦
Railroad Payment
►
4.
Terminology
♦
Types of Railroad Tracks
♦
Track Gauge
♦
Sight Distance
♦
Joint Use
♦
Preemption
►
5.
DOT/AAR Grade Crossing Inventory
♦
Background
♦
Identification Numbering System
♦
Maintenance of the Inventory System
►
2.
Railroad Agreements -- General
►
1.
Overview
♦
Financial Responsibility
♦
Agreements Required
►
2.
Railroad Force Account Work
♦
Program Overview
♦
Financing
♦
Implementation
♦
Reimbursement
►
3.
District Responsibilities
♦
Project Lead Time
♦
Plan Layout (Exhibit A) Preparation
♦
Work Order
♦
Pre-construction Meeting
♦
Construction Inspection
►
4.
TRF Responsibilities
♦
Securing Agreements
♦
Liaison Role
♦
Coordination with DES
♦
Work Order
►
3.
Highway-Rail Grade Crossing Surfaces (Construction and Reconstruction)
►
1.
Overview
♦
Introduction
♦
Importance of Timing
♦
Project Financing
♦
Project Process Overview
♦
Sub-base Work
►
2.
Plan Layout (Exhibit A)
♦
Introduction
♦
Project Data
♦
Title Block
♦
Right-of-Way Requirements
♦
Work List
♦
General Notes
♦
Warning Signal Device Location
►
3.
Agreement and Negotiations
♦
Introduction
♦
Agreement Contents
♦
Project Data
♦
License Clause
♦
Scope of Work
♦
Construction and Maintenance
♦
Insurance Clauses
♦
Payment Clause
♦
Solicitation of Bids Clause
♦
Conditions
♦
Fiber Optic Clause
♦
Negotiations
♦
After Execution
►
4.
Project Execution
♦
Work Order
♦
Pre-construction Meeting
♦
Inspection
♦
Completion Letter
►
4.
Grade Crossing Replanking Program
►
1.
Overview
♦
Program Background
♦
Program Funding
♦
Eligible Crossings
♦
Crossing Surface Materials for Replanking
►
2.
Project Selection
♦
Introduction
♦
Project Submission
♦
Figuring Estimated Cost per Vehicle
♦
Project Selection
♦
Project Cancellation
►
3.
Plan Layout (Exhibit A)
♦
Introduction
♦
Contents of Exhibit A
►
4.
Agreement and Negotiations
♦
Introduction
♦
Master Agreements
♦
Individual Project Agreements
♦
Negotiations
►
5.
Project Execution
♦
Work Order
♦
Pre-construction Meeting
♦
Inspection
♦
Completion Letter
►
5.
Spur Tracks
►
1.
Overview
♦
Introduction
♦
Grade-separated Crossings
♦
At-grade Crossings
♦
Request for Crossing
♦
Processing a Request
►
2.
Plan Layout (Exhibit A)
♦
Introduction
♦
Site Inspection
♦
Finalization of Exhibit
►
3.
Agreement and Negotiations
♦
Contents
♦
Agreement Contents
♦
Project Data
♦
Permission
♦
Scope of Work
♦
Insurance Clause
♦
Other Considerations
►
4.
Construction Inspection and Project Completion
♦
Inspection
♦
Obtaining DOT Inventory Number
►
6.
Warning Signals and Devices
►
1.
Overview
♦
Introduction
♦
General Guidelines
♦
Federal Funding Requirements
♦
TRF’s Role
►
2.
Programs and Finances
♦
Highway Construction Projects
♦
Federal Programs
♦
Railroad Signal Maintenance Payment Program
♦
Verification of Warning Devices
►
3.
Federal Railroad Signal Program
♦
Introduction
♦
Eligibility
♦
Funding
♦
Project Selection and Prioritization
♦
Project Processing Overview
►
4.
The Texas Priority Index
♦
Introduction
♦
Priority Index Formula
♦
School Bus Priority Index Formula
►
5.
Project Layout (Exhibit A)
♦
Preliminary Layout
♦
Post Diagnostic Inspection Additions
♦
Itemized Estimate
♦
After Layout Completion
►
6.
Diagnostics Inspection
♦
Purpose
♦
Inspection Team Composition
♦
District Responsibilities
♦
Inspection Activities
♦
Elimination of the Crossing
♦
Safety Enhancements
♦
Initial Project Layout Preparation
♦
General Notes
♦
Cost Participation and Reimbursement Eligibility
♦
Reimbursement Methods
♦
Final Project Layout Preparation
►
7.
Agreement Preparation and Coordination
♦
Overview
♦
Exhibit B Plan Preparation
♦
Distribution
♦
FHWA Approval
♦
Master Agreements
♦
Individual Project Agreements
♦
Negotiations
►
8.
Project Execution
♦
Work Order
♦
Project Coordination
♦
Routine Project Inspection
♦
Final Inspection
♦
Project Certification
►
9.
STOP and YIELD Signs at Grade Crossings
♦
Background
♦
National and State Provisions
♦
Crossings with Passive Warning Signs
♦
Sign Placement
♦
Assessing Need for Signs
♦
General Factors
♦
Specific Factors
♦
Positive Indications
♦
Opposing Factors
►
7.
Traffic Signal Preemption
►
1.
Overview
♦
Introduction
♦
Need for Preemption
♦
Project Process Overview
►
2.
Preliminary Inspection and Coordination
♦
Introduction
♦
Intersection Characteristics
♦
Equipment and Circuitry
♦
Cost
►
3.
Plan Layout (Exhibit A)
♦
Overview
♦
Project Data
♦
Title Block
♦
Work List
♦
If Conduit Installation is Involved
♦
If Railroad Signals Require Upgrading
♦
Preemption Worksheet
♦
Accompanying Information
►
4.
Project Execution
♦
Work Order
♦
Pre-construction Meeting
♦
Inspection
♦
Completion Letter
►
8.
Grade Separations
►
1.
Overview
♦
Introduction
♦
Project Process Overview
►
2.
Program and Finances
♦
Federal Railroad Grade Separation Program
♦
Installation of Grade Separations at Existing Highway-Rail Grade Crossings
♦
Replacement of Functionally Deficient Highway Underpasses
♦
Other Funding Sources
►
3.
Plan Layout (Exhibit A)
♦
Preliminary Plan Layout
♦
Complete Exhibit A
♦
Project Data
♦
Title Block
♦
Design Layout Sheets
♦
Work List
♦
Clearances and Crash Walls
♦
Grade Crossings
♦
Other
►
4.
Agreements and Negotiations
♦
Introduction
♦
Agreement Preparation
♦
Agreement Contents
♦
Project Data
♦
License Clause
♦
Plans, Estimates, Construction, and Maintenance
♦
Insurance Clauses
♦
Payment
♦
Conditions
♦
Fiber Optic Clause
♦
Negotiations
♦
After Execution
►
5.
Plans, Specifications, and Estimates (Exhibit B)
♦
Introduction
♦
Preparation
♦
Review and Approval
►
6.
Project Execution
♦
Work Order
♦
Pre-construction Meeting
♦
Inspection
♦
Completion Letter
►
9.
Drainage Structures and Common Ditches
►
1.
Overview
♦
Policy and Practice
♦
Drainage Structures Under or Near Railroad
♦
Common Ditch and Joint Drainage
♦
Preliminary Engineering and Coordination
►
2.
Plan Layout (Exhibit A)
♦
Overview
♦
Project Data
♦
Title Block
♦
General Notes
►
3.
Agreements and Negotiations
♦
Introduction
♦
Negotiations and Processing
♦
Agreement Contents
♦
Project Data
♦
License Clause
♦
Insurance Clauses
♦
Payment Clause
♦
Conditions
♦
Fiber Optic Clause
►
4.
Project Execution
♦
Work Orders
♦
Pre-construction Meeting
♦
Inspections
♦
Project Completion
►
10.
Other Railroad Agreements
►
1.
Letter Agreements
♦
Policy and Practices
♦
Seal Coat and ACP Overlay Projects
♦
Installation of Overhead Wire Lines
♦
Installation of Conduit Under Track
♦
Minor Pavement Rehabilitation
♦
Minor Maintenance
♦
Plan Layout (Exhibit A)
♦
Agreement Preparation and Negotiations
♦
Work Order
♦
Completion Letter
►
2.
Right of Entry and Survey Agreements
♦
Policy and Practice
♦
Insurance Considerations
♦
Layout (Exhibit A)
♦
Agreement Preparation
♦
Agreement Negotiations
♦
Work Order
♦
Completion Letter
►
11.
Crossing Closure, Relocation, and Consolidation
►
1.
Overview
♦
Policy
♦
General Considerations
►
2.
Crossing Closure
♦
Introduction
♦
Obstacles to Crossing Closure
♦
Systems Approach
♦
Emergency Vehicle Routing
♦
Identifying Closure Candidates
♦
Removal of Devices
♦
Erection of Warning and Regulatory Devices
♦
Notification of Alternate Routes
►
3.
Relocation and Consolidation
♦
Introduction
♦
Planning
♦
Railroad Relocation
♦
Highway Relocation
►
4.
Dismantling of Warning Signals
♦
Introduction
♦
Application
♦
Determining if a Permit Is Required
♦
If a Permit Is Not Required
♦
If a Permit is Required
♦
Processing the Application
♦
Salvage Value
♦
Receipt of Payment and Permit Issuance
♦
Permit Process Flow Chart
►
A.
Forms
Railroad Operations Volume
May 1998
Printer-friendly version (PDF)