| Traffic Signals Manual |
TxDOT Manual System
♦
Manual Notice 1999-1
►
1.
Introduction
►
1.
Overview
♦
Scope of this Manual
♦
Traffic Signal Policy
♦
The Texas Manual on Uniform Traffic Control Devices (TMUTCD)
♦
Using the TMUTCD
♦
Obtaining Copies of the TMUTCD
♦
Traffic Signal Agreements
♦
Traffic Signal Project Process Overview
►
2.
Traffic Operations Division Support
♦
TRF Liaison
♦
TRF Support Functions
♦
Signal System Analysis
♦
Specification Writing and Maintenance
♦
Equipment Testing for General Services
►
3.
Equipment Acquisition
♦
Acquisition Methods
♦
Acquisition through GSD General Warehouse
♦
Acquisition through Small Purchase
♦
Acquisition through Blanket Order
♦
Acquisition through Construction Contract
♦
Coordinating First Time Purchases with TRF
♦
Equipment Testing
♦
Product Prequalification
♦
Equipment for Contract Jobs
►
2.
Requests for Traffic Signals
►
1.
Sources of Requests
♦
Introduction
♦
Requests from Unincorporated Areas
♦
Requests from Incorporated Areas
♦
Requests from Private Organizations
►
2.
Action on Requests
♦
Districts Act on Requests
♦
Acknowledgment of Request
♦
Process Overview
►
3.
Traffic Studies
►
1.
Overview
♦
Introduction
♦
Responsibility
♦
Costs
♦
Required Information
♦
Warrant Analysis Data
►
2.
Condition Diagram
♦
Introduction
♦
Information Sources
♦
Additional Necessary Information
►
3.
Location Map and Photographs
♦
Location Map
♦
Photographs
►
4.
Accident (Crash) Information
♦
Introduction
♦
Mainframe Computer Reports
♦
Specialized Analyses and Customized Reports
♦
Officer’s Report from DPS
►
5.
Vehicle and Pedestrian Traffic Counts
♦
Introduction
♦
Types of Counts
♦
Vehicle Counts at Existing Locations
♦
Counting Techniques
♦
Recording Manual Counts
♦
Estimated and Projected Counts
♦
Pedestrian Counts
♦
School Pedestrian Counts
►
6.
Approach Speeds
♦
Introduction
♦
Special Situations
►
7.
Traffic Survey Count Analysis
♦
Count Data Processing
♦
The Traffic Survey — Count Analysis Form
♦
Intersection Traffic and Pedestrian Count Analysis Program
►
8.
Intersection Delay Study
♦
Introduction
♦
Time of Study
♦
Equipment
♦
Form
♦
Procedure
♦
Study Results
►
4.
Operational Considerations
►
1.
Overview
♦
Introduction
♦
Equipment Repair
►
2.
Coordinated Operation
♦
Introduction
♦
Coordinating Operations with Other Jurisdictions
♦
Advantages of Coordinated Operation
♦
Drawbacks of Coordinated Operation
♦
Determining Effectiveness of a Coordinated Operation
►
3.
Preemption
♦
Preemption by Railroad Equipment
♦
Preemption by Emergency Vehicles
►
4.
Flashing Operation
♦
Introduction
♦
Emergency Flash
♦
Maintenance Flash
♦
Railroad Preemption Flash
♦
Scheduled Flash
♦
Left Turn Flash
►
5.
Traffic Signal Projects
►
1.
Overview
♦
Introduction
♦
Division Responsibilities
♦
Authorization Request Form
♦
Recommending Against Installation
♦
Marginally Warranted Signals
♦
Removal of Traffic Signals
♦
City Traffic Signal Installation Using Local Funds
♦
Project Cancellations or Change
►
2.
Projects Installed by the State
♦
Introduction
♦
Programming
♦
Agreements
♦
Method of Construction
♦
Submission Requirements
♦
Submission Requirements for State Forces Projects
♦
Submission Requirements for Projects Let to Statewide Contract
♦
Change of Construction Method
♦
Letting
♦
Construction
♦
Shop Drawings
♦
Changes on Contract Projects
♦
Changes on City Force Projects
♦
Project Close-out
►
3.
Plan Requirements for PS&E
♦
Introduction
♦
Data for Plan Preparation
♦
Title Sheet
♦
Estimate and Quantity Sheet
♦
Condition Diagram Sheet
♦
Plan Sheets
♦
Elevation Sheets
♦
Detail Sheets
♦
Specifications
♦
PS&E Paperwork
►
A.
Forms
►
B.
Determination of Need for Traffic Control at School Crossings
Traffic Signals Manual
November 1999
Printer-friendly version (PDF)