Chapter 1: Records, Reports and Closing of Projects

Anchor: #CHDDAABE

Section 1: Records

Anchor: #i999405

ROW Records

The original right of way (ROW) project records must be retained for four years after closing a project. As a general rule, these records will be electronically stored before final retention date. After being electronically stored, and after the retention period, the original records may be destroyed except for the following, which are retained in the ROW Division as part of TxDOT's permanent files:

The TxDOT Records Management Manual contains a list of items which must be retained, and identifies which items must be retained permanently.

The Records Retention Schedule is available on the Department's intranet site as follows:

https://tntoday.dot.state.tx.us/imd/Documents/Online_Manuals_and_Records_Management_Page_Documents/TxDOT_RecordsRetentionSchedule.pdf.