Section 3: Preventive Maintenance Contracts
Anchor: #i1005316Preventive Maintenance Contracts (CPM)
The CPM program was originally created under Commission Minute Order #85883 on June 30, 1987. The purpose of the CPM program is to prevent major deterioration to roadways and bridges through a planned cycle of seal coats, overlays, cleaning and sealing joints in concrete pavement or bridge decks, painting of bridges and other related work. These type projects are now programmed with Category One funding through the Finance Division, Programming and Letting Section and let as a construction contract through the Design Division and the Construction Division.