Section 9: TxDOT Assistance to the Utility

Anchor: #i1003624

Overview

Per the UAR, design of the utility’s adjustment is the responsibility of the utility.

Since the utility’s design staff must plan and design the proposed adjustment of their facilities, plan preparation is the responsibility of the utility. Nevertheless, TxDOT personnel and TxDOT’s Consultants should assist the utility by providing existing and proposed:

Close contact between authorized District and utility representatives is imperative in facilitating the continuous flow of information to the utility regarding the design of the transportation facility.